Electrotechnical Consultancy

Load Surveys

We are able to install equipment to monitor and record the supply demand or load at any point in an installation. This is particularly useful for establishing the existing demand prior to or after expansion of an installation. These surveys are also useful for establishing power wastage or comparison of accuracy with existing metering equipment.

We are able to monitor and record voltage and current as well as power KVAs, KVAr, KWh and power factor.

Detailed reports can be provided for all voltage, current and power parameters as required. A survey typically lasts for 7 days.

Equipment may also be hired if the client wishes to conduct their own surveys.

Please contact us for further details.